Triple

T30611864
Position Surface form Disambiguated ID Type / Status
Subject Eastern Siberia–Pacific Ocean oil pipeline E779198 entity
Predicate phase2CommissioningYear P170470 FINISHED
Object 2012 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2012 | Statement: [Eastern Siberia–Pacific Ocean oil pipeline, phase2CommissioningYear, 2012]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: phase2CommissioningYear
Context triple: [Eastern Siberia–Pacific Ocean oil pipeline, phase2CommissioningYear, 2012]
  • A. phase1CommissioningYear
    Indicates the calendar year in which the first phase of something (such as a project, facility, or system) was officially commissioned or put into operation.
  • B. commissioningEndYear
    Indicates the calendar year in which the commissioning or initial operational phase of something is completed or ends.
  • C. commissioningYearUnit1
    Indicates the time unit (e.g., year, month) used to express the commissioning year of the first unit.
  • D. reactor3CommissioningDate
    Indicates the date on which the third reactor in a series was formally commissioned and entered into operational service.
  • E. commissioningEndDate
    Indicates the date on which the commissioning process or commissioning-related responsibilities are completed or terminated.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224a21fc08190abd9d8dd9eb6bb4c completed April 29, 2026, 3:32 p.m.
NER Named-entity recognition batch_69f69063edbc81909e7735954aabee0b completed May 3, 2026, 12:01 a.m.
PD Predicate disambiguation batch_69f68b7b03488190b1db5fde4c7dd6e5 completed May 2, 2026, 11:40 p.m.
PDg Predicate description generation batch_69f68f6584a88190a8c4d95c0c84bee9 completed May 2, 2026, 11:57 p.m.
Created at: April 29, 2026, 8:26 p.m.