Triple
T3060612
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Brantas River |
E60586
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object |
Wlingi Dam
Wlingi Dam is a hydroelectric and irrigation dam located on the Brantas River in East Java, Indonesia.
|
E328605
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Wlingi Dam | Statement: [Brantas River, hasDam, Wlingi Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Wlingi Dam Context triple: [Brantas River, hasDam, Wlingi Dam]
-
A.
Tawa Dam
Tawa Dam is a major masonry dam in Madhya Pradesh, India, built on the Tawa River for irrigation, flood control, and hydroelectric power generation.
-
B.
Bargi Dam
Bargi Dam is a major multipurpose dam built on the Narmada River in Madhya Pradesh, India, primarily used for irrigation, hydropower generation, and flood control.
-
C.
Betania Dam
Betania Dam is a major hydroelectric dam and reservoir in Colombia, known for generating power and supporting irrigation and aquaculture in the Huila region.
-
D.
Jebba Dam
Jebba Dam is a major hydroelectric power facility in Nigeria that harnesses the flow of the Niger River to generate electricity and support regional water management.
-
E.
Pandoh Dam
Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Wlingi Dam Triple: [Brantas River, hasDam, Wlingi Dam]
Generated description
Wlingi Dam is a hydroelectric and irrigation dam located on the Brantas River in East Java, Indonesia.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Wlingi Dam Target entity description: Wlingi Dam is a hydroelectric and irrigation dam located on the Brantas River in East Java, Indonesia.
-
A.
Tawa Dam
Tawa Dam is a major masonry dam in Madhya Pradesh, India, built on the Tawa River for irrigation, flood control, and hydroelectric power generation.
-
B.
Bargi Dam
Bargi Dam is a major multipurpose dam built on the Narmada River in Madhya Pradesh, India, primarily used for irrigation, hydropower generation, and flood control.
-
C.
Betania Dam
Betania Dam is a major hydroelectric dam and reservoir in Colombia, known for generating power and supporting irrigation and aquaculture in the Huila region.
-
D.
Jebba Dam
Jebba Dam is a major hydroelectric power facility in Nigeria that harnesses the flow of the Niger River to generate electricity and support regional water management.
-
E.
Pandoh Dam
Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8578137c81908259dcb27c7d6d7c |
completed | March 8, 2026, 2:19 p.m. |
| NER | Named-entity recognition | batch_69ad9e9e1e248190b5ed5ebcdad1321e |
completed | March 8, 2026, 4:06 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b20f45f6a08190a79df4c7a7846320 |
completed | March 12, 2026, 12:56 a.m. |
| NEDg | Description generation | batch_69b21083db7081908f8bc4240fc2b08b |
completed | March 12, 2026, 1:01 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69b210fa8a7c8190ae4527161aa3af54 |
completed | March 12, 2026, 1:03 a.m. |
Created at: March 8, 2026, 3:02 p.m.