Triple
T3060611
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Brantas River |
E60586
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object |
Selorejo Dam
Selorejo Dam is a multipurpose reservoir in East Java, Indonesia, known for irrigation, hydropower generation, flood control, and tourism within the Brantas River basin.
|
E328090
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Selorejo Dam | Statement: [Brantas River, hasDam, Selorejo Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Selorejo Dam Context triple: [Brantas River, hasDam, Selorejo Dam]
-
A.
Jatiluhur Reservoir
Jatiluhur Reservoir is a large multipurpose dam and artificial lake in West Java, Indonesia, used for hydroelectric power, irrigation, flood control, and water supply.
-
B.
Cirata Reservoir
Cirata Reservoir is a large artificial lake and hydroelectric power reservoir in West Java, Indonesia, used for electricity generation, irrigation, and fisheries.
-
C.
Sengguruh Dam
Sengguruh Dam is a hydroelectric and flood-control dam located on the Brantas River in East Java, Indonesia.
-
D.
Surobi Dam
Surobi Dam is a hydroelectric and irrigation dam located on the Kabul River in eastern Afghanistan.
-
E.
Pandoh Dam
Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Selorejo Dam Triple: [Brantas River, hasDam, Selorejo Dam]
Generated description
Selorejo Dam is a multipurpose reservoir in East Java, Indonesia, known for irrigation, hydropower generation, flood control, and tourism within the Brantas River basin.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Selorejo Dam Target entity description: Selorejo Dam is a multipurpose reservoir in East Java, Indonesia, known for irrigation, hydropower generation, flood control, and tourism within the Brantas River basin.
-
A.
Jatiluhur Reservoir
Jatiluhur Reservoir is a large multipurpose dam and artificial lake in West Java, Indonesia, used for hydroelectric power, irrigation, flood control, and water supply.
-
B.
Cirata Reservoir
Cirata Reservoir is a large artificial lake and hydroelectric power reservoir in West Java, Indonesia, used for electricity generation, irrigation, and fisheries.
-
C.
Sengguruh Dam
Sengguruh Dam is a hydroelectric and flood-control dam located on the Brantas River in East Java, Indonesia.
-
D.
Surobi Dam
Surobi Dam is a hydroelectric and irrigation dam located on the Kabul River in eastern Afghanistan.
-
E.
Pandoh Dam
Pandoh Dam is an embankment dam in Himachal Pradesh, India, built for hydroelectric power generation and water diversion as part of the Beas Project.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8578137c81908259dcb27c7d6d7c |
completed | March 8, 2026, 2:19 p.m. |
| NER | Named-entity recognition | batch_69ad9e9e1e248190b5ed5ebcdad1321e |
completed | March 8, 2026, 4:06 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b2035055148190ad1cdd6374820e60 |
completed | March 12, 2026, 12:05 a.m. |
| NEDg | Description generation | batch_69b207593cb8819091203b3738fa69db |
completed | March 12, 2026, 12:22 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69b2083329cc8190a88bfa39d7572317 |
completed | March 12, 2026, 12:26 a.m. |
Created at: March 8, 2026, 3:02 p.m.