Triple
T3060431
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Maarschalkerweerd & Zoon |
E60583
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | organ building firm |
C12191
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: organ building firm Context triple: [Maarschalkerweerd & Zoon, instanceOf, organ building firm]
-
A.
construction management firm
A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
-
B.
engineering firm
An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
-
C.
modernist architecture firm
A modernist architecture firm is a design-focused company that creates functional, minimalist buildings emphasizing clean lines, open spaces, and innovative use of modern materials and technology.
-
D.
interior design firm
An interior design firm is a professional business that plans, designs, and coordinates the aesthetic and functional layout of interior spaces for residential, commercial, or institutional clients.
-
E.
bridge construction company
A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8578137c81908259dcb27c7d6d7c |
completed | March 8, 2026, 2:19 p.m. |
Created at: March 8, 2026, 3:02 p.m.