Triple
T30595357
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Implementation Review Mechanism |
E778767
|
entity |
| Predicate | secondReviewCycleFocus |
P195729
|
FINISHED |
| Object | preventive measures |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: preventive measures | Statement: [Implementation Review Mechanism, secondReviewCycleFocus, preventive measures]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: secondReviewCycleFocus Context triple: [Implementation Review Mechanism, secondReviewCycleFocus, preventive measures]
-
A.
secondCyclePeriod
Indicates the duration or interval of time associated with a second occurrence or cycle of a recurring process or event.
-
B.
secondEditionFocus
Indicates that the relationship or content specifically pertains to the second edition version or focus of something, as opposed to other editions.
-
C.
secondPartFocus
Indicates that the communicative or informational focus is placed on the second part or element in a two-part structure or relation.
-
D.
secondActionPlanPeriod
Indicates that something occurs or is designated within the second defined period of an action plan.
-
E.
secondPhase
Indicates that an entity is in, or has progressed to, the second phase or stage of a multi-phase process or sequence.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224a1570c8190a85d3ac330479a79 |
completed | April 29, 2026, 3:32 p.m. |
| NER | Named-entity recognition | batch_69fde49a084081909d99b1e0258169d5 |
completed | May 8, 2026, 1:26 p.m. |
| PD | Predicate disambiguation | batch_69fde1d04bd881909a46ecbbf18dfe59 |
completed | May 8, 2026, 1:14 p.m. |
| PDg | Predicate description generation | batch_69fde49953c481909ac352ab36fa9ff2 |
completed | May 8, 2026, 1:26 p.m. |
Created at: April 29, 2026, 8:24 p.m.