Triple

T30538878
Position Surface form Disambiguated ID Type / Status
Subject Oxagon E777221 entity
Predicate instanceOf P0 FINISHED
Object planned industrial city C22 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned industrial city
Context triple: [Oxagon, instanceOf, planned industrial city]
  • A. planned city chosen
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • B. planned garden city
    A planned garden city is a deliberately designed urban settlement that integrates residential, commercial, and green spaces in a balanced layout to promote healthy living, social cohesion, and environmental sustainability.
  • C. industrial town
    An industrial town is a settlement whose economy and landscape are dominated by factories, warehouses, and related infrastructure supporting manufacturing and heavy industry.
  • D. industrial center
    An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
  • E. planned commercial district
    A planned commercial district is a deliberately designed area designated for concentrated business, retail, and service activities, typically guided by zoning regulations and urban planning principles to support economic activity and accessibility.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2249d183c8190b79937c1768d2163 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:19 p.m.