Triple
T30538878
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oxagon |
E777221
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned industrial city |
C22
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned industrial city Context triple: [Oxagon, instanceOf, planned industrial city]
-
A.
planned city
chosen
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
B.
planned garden city
A planned garden city is a deliberately designed urban settlement that integrates residential, commercial, and green spaces in a balanced layout to promote healthy living, social cohesion, and environmental sustainability.
-
C.
industrial town
An industrial town is a settlement whose economy and landscape are dominated by factories, warehouses, and related infrastructure supporting manufacturing and heavy industry.
-
D.
industrial center
An industrial center is a concentrated area where manufacturing, production, and related economic activities are clustered, supported by specialized infrastructure and labor.
-
E.
planned commercial district
A planned commercial district is a deliberately designed area designated for concentrated business, retail, and service activities, typically guided by zoning regulations and urban planning principles to support economic activity and accessibility.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2249d183c8190b79937c1768d2163 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8:19 p.m.