Triple
T30510687
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Campbell Water Tower |
E776410
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | elevated water tank |
C12648
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: elevated water tank Context triple: [Campbell Water Tower, instanceOf, elevated water tank]
-
A.
water reservoir
A water reservoir is a man-made or natural storage area designed to collect, hold, and regulate water for uses such as drinking supply, irrigation, flood control, and power generation.
-
B.
water tower complex
chosen
A water tower complex is a facility comprising one or more elevated storage tanks and associated infrastructure designed to store and distribute potable water using gravity-fed pressure.
-
C.
water-lifting device
A water-lifting device is a mechanism designed to raise water from a lower elevation to a higher one for purposes such as irrigation, supply, or drainage.
-
D.
public water access system
A public water access system is an infrastructure and management framework that provides communities with safe, reliable, and equitable access to potable water through shared sources such as taps, fountains, and distribution points.
-
E.
elevated house
An elevated house is a dwelling raised above ground level on stilts, piers, or a platform to protect against flooding, improve ventilation, or adapt to uneven terrain.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2249a155c8190b1d512106007e9bb |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8:16 p.m.