Triple

T30486278
Position Surface form Disambiguated ID Type / Status
Subject Lingen nuclear power plant E775729 entity
Predicate gridOperatorDuringOperation P146855 FINISHED
Object VEW NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: VEW | Statement: [Lingen nuclear power plant, gridOperatorDuringOperation, VEW]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: gridOperatorDuringOperation
Context triple: [Lingen nuclear power plant, gridOperatorDuringOperation, VEW]
  • A. operatorDuringOperation
    Indicates that an operator is the one performing or responsible for an operation during its execution.
  • B. energySystemOperator chosen
    Indicates that one entity operates, manages, or controls an energy system on behalf of or in relation to another entity.
  • C. operatingAuthority
    Indicates that an entity has the official power, permission, or jurisdiction to operate, manage, or control another entity or activity.
  • D. operatorDuringEvent
    Indicates that an operator is actively performing their role or function throughout the duration of a specified event.
  • E. powerPlantOperationStart
    Indicates the point in time when a power plant begins operating or generating power.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22497f91c8190afa7165bc900accd completed April 29, 2026, 3:32 p.m.
NER Named-entity recognition batch_69f6874635ac8190b371d40aa40ee070 completed May 2, 2026, 11:22 p.m.
PD Predicate disambiguation batch_69f678d2196c8190b9d0d2fcd47cc539 completed May 2, 2026, 10:21 p.m.
Created at: April 29, 2026, 8:13 p.m.