Triple

T30481354
Position Surface form Disambiguated ID Type / Status
Subject Riyadh Air E775595 entity
Predicate plannedOperationsStart P26282 FINISHED
Object mid-2025 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: mid-2025 | Statement: [Riyadh Air, plannedOperationsStart, mid-2025]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedOperationsStart
Context triple: [Riyadh Air, plannedOperationsStart, mid-2025]
  • A. plannedOperationUntil
    Indicates that an operation is scheduled or intended to continue up to a specified end time or condition.
  • B. operationStart
    Indicates the point in time or event at which a specific operation or process begins.
  • C. planningStarted
    Indicates that the process of planning for a particular task, project, or event has been initiated.
  • D. operatorPlanned
    Indicates that an operator has scheduled or arranged a specific action, process, or operation to occur.
  • E. plannedAt chosen
    Indicates that an event, action, or activity is scheduled or intended to occur at a specific time or date.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22497341481909c21ba329fadaa6b completed April 29, 2026, 3:32 p.m.
NER Named-entity recognition batch_69f757898fe48190b124dc7301672623 completed May 3, 2026, 2:11 p.m.
PD Predicate disambiguation batch_69f754c484348190948d2a04ff228fb1 completed May 3, 2026, 1:59 p.m.
Created at: April 29, 2026, 8:12 p.m.