Triple
T30476399
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Công viên 23 tháng 9 |
E775454
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | công viên đô thị |
C218
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: công viên đô thị Context triple: [Công viên 23 tháng 9, instanceOf, công viên đô thị]
-
A.
urban park
chosen
An urban park is a publicly accessible green space within a city that provides recreational areas, natural scenery, and social gathering places for residents and visitors.
-
B.
urban state park
An urban state park is a publicly managed natural or recreational area located within or adjacent to a city, providing green space, outdoor activities, and conservation of local ecosystems for urban residents and visitors.
-
C.
парк
Парк — это общественное озеленённое пространство, предназначенное для отдыха, прогулок, развлечений и общения людей на открытом воздухе.
-
D.
collection of parks
A collection of parks is an organized grouping of multiple park areas, managed or considered together as a unified set for recreation, conservation, or urban planning purposes.
-
E.
national city park
A national city park is a protected natural or landscaped area within or adjacent to an urban environment, designated and managed at the national level to conserve biodiversity, provide recreation, and enhance residents’ quality of life.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f22497341481909c21ba329fadaa6b |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8:12 p.m.