Triple

T30476399
Position Surface form Disambiguated ID Type / Status
Subject Công viên 23 tháng 9 E775454 entity
Predicate instanceOf P0 FINISHED
Object công viên đô thị C218 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: công viên đô thị
Context triple: [Công viên 23 tháng 9, instanceOf, công viên đô thị]
  • A. urban park chosen
    An urban park is a publicly accessible green space within a city that provides recreational areas, natural scenery, and social gathering places for residents and visitors.
  • B. urban state park
    An urban state park is a publicly managed natural or recreational area located within or adjacent to a city, providing green space, outdoor activities, and conservation of local ecosystems for urban residents and visitors.
  • C. парк
    Парк — это общественное озеленённое пространство, предназначенное для отдыха, прогулок, развлечений и общения людей на открытом воздухе.
  • D. collection of parks
    A collection of parks is an organized grouping of multiple park areas, managed or considered together as a unified set for recreation, conservation, or urban planning purposes.
  • E. national city park
    A national city park is a protected natural or landscaped area within or adjacent to an urban environment, designated and managed at the national level to conserve biodiversity, provide recreation, and enhance residents’ quality of life.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22497341481909c21ba329fadaa6b completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:12 p.m.