Triple

T30461841
Position Surface form Disambiguated ID Type / Status
Subject Mediterranean transport network E775034 entity
Predicate instanceOf P0 FINISHED
Object multimodal transport system C43823 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multimodal transport system
Context triple: [Mediterranean transport network, instanceOf, multimodal transport system]
  • A. integrated transportation and hospitality system
    An integrated transportation and hospitality system is a coordinated network that seamlessly combines travel services (such as flights, trains, and local transit) with lodging, amenities, and guest services into a unified, end-to-end customer experience.
  • B. continuous transport system
    A continuous transport system is a material handling arrangement that moves goods or resources in an uninterrupted flow along a fixed path using devices such as conveyors, pipelines, or automated tracks.
  • C. multimodal transport platform chosen
    A multimodal transport platform is an integrated system that coordinates and optimizes the planning, booking, and management of journeys across multiple transportation modes (such as rail, road, air, and sea) through a unified digital interface.
  • D. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • E. public transport information system
    A public transport information system is a software platform that collects, processes, and disseminates real-time and scheduled data about public transit services to passengers, operators, and other stakeholders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2249622a48190b1fae2e3e4ee958a completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:10 p.m.