Triple
T30461840
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mediterranean transport network |
E775034
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | regional infrastructure system |
C4130
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: regional infrastructure system Context triple: [Mediterranean transport network, instanceOf, regional infrastructure system]
-
A.
transport infrastructure network
chosen
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
B.
regional institutional system
A regional institutional system is a coordinated network of organizations, rules, and practices within a specific geographic area that collectively shape governance, economic activity, and social outcomes.
-
C.
regional transport plan
A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
-
D.
infrastructure
Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
-
E.
regional axis
A regional axis is a conceptual line or direction that organizes, connects, or structures spatial relationships and activities across a defined geographic region.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2249622a48190b1fae2e3e4ee958a |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8:10 p.m.