Triple

T3043623
Position Surface form Disambiguated ID Type / Status
Subject Unfinished Obelisk E83188 entity
Predicate constructionPhase P44772 FINISHED
Object rough shaping completed LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: rough shaping completed | Statement: [Unfinished Obelisk, constructionPhase, rough shaping completed]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionPhase
Context triple: [Unfinished Obelisk, constructionPhase, rough shaping completed]
  • A. mainConstructionPhaseUnder
    Indicates that one construction phase occurs under or is subordinate to another primary construction phase in a project’s timeline or hierarchy.
  • B. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • C. constructionProgram
    Indicates that an entity is involved in or associated with a program or plan for constructing, building, or developing something.
  • D. constructionTime
    Indicates the duration or specific point in time required to construct or build an entity.
  • E. constructionType
    Indicates the specific method or style by which something is built or constructed.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b2298908190a7cb4e9bdbf064d0 completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69ad9b5ec5988190b8b6c95c743c6d1e completed March 8, 2026, 3:53 p.m.
PD Predicate disambiguation batch_69ad961fc62c819087c4c3a44b00847d completed March 8, 2026, 3:30 p.m.
PDg Predicate description generation batch_69ad97f6af3881909f4547967384114c completed March 8, 2026, 3:38 p.m.
Created at: March 8, 2026, 3:01 p.m.