Triple

T30428464
Position Surface form Disambiguated ID Type / Status
Subject Sony WH-1000XM3 E774095 entity
Predicate batteryLifeWithNCOn P25992 FINISHED
Object up to 30 hours LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: up to 30 hours | Statement: [Sony WH-1000XM3, batteryLifeWithNCOn, up to 30 hours]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: batteryLifeWithNCOn
Context triple: [Sony WH-1000XM3, batteryLifeWithNCOn, up to 30 hours]
  • A. batteryLife chosen
    Indicates how long a device can operate on a single charge or set of batteries before needing to be recharged or replaced.
  • B. hasBackupBattery
    Indicates that an entity is equipped with an additional battery intended to provide power when the primary power source is unavailable or fails.
  • C. requiresBattery
    Indicates that one entity depends on a battery from another entity in order to function or be used.
  • D. mainBatteryFeature
    Indicates the primary functional characteristic or capability associated with a battery.
  • E. batteryCapacity
    Indicates the amount of electrical energy a battery can store or deliver, typically expressed in units like mAh or Wh.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22491ba248190b9a4776ca8e42d02 completed April 29, 2026, 3:32 p.m.
NER Named-entity recognition batch_69f68f670b608190a0b6ab60d722b4e0 completed May 2, 2026, 11:57 p.m.
PD Predicate disambiguation batch_69f68b7b03488190b1db5fde4c7dd6e5 completed May 2, 2026, 11:40 p.m.
Created at: April 29, 2026, 8:06 p.m.