Triple
T30427727
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Circle Limit III |
E774079
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | tessellation artwork |
C24554
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: tessellation artwork Context triple: [Circle Limit III, instanceOf, tessellation artwork]
-
A.
tiling of the plane
chosen
A tiling of the plane is a covering of the entire two-dimensional plane by non-overlapping shapes (tiles) that fit together without gaps or overlaps.
-
B.
aperiodic tiling
An aperiodic tiling is a way of covering the plane with shapes that fit together without gaps or overlaps but never repeat in a regular, periodic pattern.
-
C.
mosaic
A mosaic is an artwork or decorative surface composed of small, often colored pieces of materials such as glass, stone, or tile arranged to form patterns or images.
-
D.
geometric abstraction artwork
A geometric abstraction artwork is a non-representational visual composition that uses shapes, lines, colors, and spatial relationships to create meaning and aesthetic impact without depicting recognizable objects.
-
E.
concrete art
Concrete art is a non-representational art movement that focuses on purely abstract, geometric forms and colors, emphasizing objective visual elements over depiction of real-world subjects.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f22491ba248190b9a4776ca8e42d02 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8:06 p.m.