Triple

T30402338
Position Surface form Disambiguated ID Type / Status
Subject NaMATA E773381 entity
Predicate instanceOf P0 FINISHED
Object metropolitan transport authority C221 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: metropolitan transport authority
Context triple: [NaMATA, instanceOf, metropolitan transport authority]
  • A. public transportation agency
    A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
  • B. mass transit operator chosen
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • C. Regional Transport Office
    A Regional Transport Office is a government agency responsible for vehicle registration, driver licensing, enforcement of transport regulations, and maintenance of regional motor vehicle records.
  • D. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • E. metropolitan authority
    A metropolitan authority is a governing body responsible for planning, coordinating, and managing public services and development across a large urban area and its surrounding municipalities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2248facd48190b183c3f3ca6daef7 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:03 p.m.