Triple
T30388863
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | continuous integration builds |
E773017
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | development release channel |
C34788
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: development release channel Context triple: [continuous integration builds, instanceOf, development release channel]
-
A.
software release
A software release is a specific, packaged version of a software product that is formally delivered to users, typically including new features, fixes, and documentation.
-
B.
development network
A development network is a collaborative system of individuals, organizations, and resources interconnected to support and accelerate growth, learning, and innovation toward shared development goals.
-
C.
Google Chrome feature rollout process
The Google Chrome feature rollout process is a staged, data-driven deployment pipeline that gradually introduces new browser features to increasing user cohorts while monitoring stability, performance, and user impact before full release.
-
D.
development site
A development site is a designated parcel of land or property prepared or planned for construction, redevelopment, or other built-environment projects.
-
E.
Android developer preview
chosen
An Android developer preview is an early, pre-release version of the Android operating system provided to developers for testing, feedback, and app compatibility updates before the official public release.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2248ef0a48190aa54d4d8ac3e5758 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8:01 p.m.