Triple

T30387526
Position Surface form Disambiguated ID Type / Status
Subject Google Summer of Code E772988 entity
Predicate instanceOf P0 FINISHED
Object Google program C42858 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Google program
Context triple: [Google Summer of Code, instanceOf, Google program]
  • A. Google X project
    A Google X project is an experimental, high-risk, high-reward initiative within Alphabet’s research lab focused on developing breakthrough technologies that could have massive, long-term societal impact.
  • B. Google developer product chosen
    A Google developer product is a tool, platform, or service provided by Google that enables software developers to build, test, deploy, and optimize applications or integrations within the Google ecosystem or on the open web.
  • C. Google service
    A Google service is any software application or platform provided by Google that delivers specific online functionality—such as search, email, storage, or productivity tools—over the internet to users.
  • D. Google office
    A Google office is a modern, collaborative workspace designed by Google that combines advanced technology, flexible work areas, and employee-focused amenities to foster innovation and productivity.
  • E. Google internal system
    A Google internal system is an infrastructure or software platform used within Google to support its internal operations, development workflows, data management, and organizational processes, typically inaccessible to external users.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2248ef0a48190aa54d4d8ac3e5758 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:01 p.m.