Triple

T30387098
Position Surface form Disambiguated ID Type / Status
Subject KDE Accessibility E772979 entity
Predicate instanceOf P0 FINISHED
Object KDE subproject C56090 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: KDE subproject
Context triple: [KDE Accessibility, instanceOf, KDE subproject]
  • A. KDE software component chosen
    A KDE software component is a modular, reusable piece of functionality within the KDE ecosystem that provides specific features or services to applications and the desktop environment.
  • B. Fedora Project subproject
    A Fedora Project subproject is a focused collaborative initiative within the broader Fedora community that develops, maintains, or supports a specific aspect of the Fedora operating system or ecosystem.
  • C. Gentoo Linux subproject
    A Gentoo Linux subproject is a focused organizational unit within the Gentoo ecosystem that manages a specific area of development, maintenance, or infrastructure under the broader Gentoo project.
  • D. GNOME component
    A GNOME component is a modular software element within the GNOME desktop environment that provides specific functionality or services, such as panels, applets, libraries, or system tools, to create a cohesive user experience.
  • E. Fedora project
    The Fedora Project is a community-driven open source initiative that develops the Fedora Linux distribution and related technologies, focusing on innovation, freedom, and collaboration.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2248ef0a48190aa54d4d8ac3e5758 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8:01 p.m.