Triple
T30379035
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | LAX landside ground transportation system |
E772770
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | airport ground access system |
C4129
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: airport ground access system Context triple: [LAX landside ground transportation system, instanceOf, airport ground access system]
-
A.
airport system
chosen
An airport system is an integrated network of facilities, services, and processes that manages the safe, efficient movement of passengers, cargo, and aircraft within and around an airport.
-
B.
airport service area
An airport service area is the designated zone within and around an airport where operational, maintenance, and support activities are conducted to facilitate aircraft handling and passenger services.
-
C.
airport authority
An airport authority is an organization responsible for the ownership, management, operation, and regulation of an airport or group of airports, ensuring safe, efficient, and compliant aviation services and facilities.
-
D.
airport parking
Airport parking is a designated area or facility where travelers temporarily leave their vehicles while they use air transportation services.
-
E.
passenger terminal area
A passenger terminal area is a designated zone within a transportation facility where travelers access services such as check-in, security, boarding, and baggage claim.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2248e3444819081b05712dc6873de |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8 p.m.