Triple
T30378960
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ExpressLanes on I-10 and I-110 |
E772768
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | managed lane facility |
C5921
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: managed lane facility Context triple: [ExpressLanes on I-10 and I-110, instanceOf, managed lane facility]
-
A.
high-occupancy toll lanes
chosen
High-occupancy toll lanes are special highway lanes that allow vehicles with multiple occupants to travel for free or at reduced cost while single-occupant vehicles can use them by paying a variable toll designed to manage congestion and maintain faster traffic flow.
-
B.
controlled-access highway
A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
-
C.
highway segment
A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
-
D.
motorway
A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
-
E.
highway access point cluster
A highway access point cluster is a grouping of closely located on-ramps, off-ramps, and interchanges that collectively provide concentrated entry and exit options to a highway network within a specific area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2248e3444819081b05712dc6873de |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 8 p.m.