Triple

T30378960
Position Surface form Disambiguated ID Type / Status
Subject ExpressLanes on I-10 and I-110 E772768 entity
Predicate instanceOf P0 FINISHED
Object managed lane facility C5921 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: managed lane facility
Context triple: [ExpressLanes on I-10 and I-110, instanceOf, managed lane facility]
  • A. high-occupancy toll lanes chosen
    High-occupancy toll lanes are special highway lanes that allow vehicles with multiple occupants to travel for free or at reduced cost while single-occupant vehicles can use them by paying a variable toll designed to manage congestion and maintain faster traffic flow.
  • B. controlled-access highway
    A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
  • C. highway segment
    A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
  • D. motorway
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • E. highway access point cluster
    A highway access point cluster is a grouping of closely located on-ramps, off-ramps, and interchanges that collectively provide concentrated entry and exit options to a highway network within a specific area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2248e3444819081b05712dc6873de completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8 p.m.