Triple

T30378718
Position Surface form Disambiguated ID Type / Status
Subject Los Angeles Metro Green Line project E772762 entity
Predicate instanceOf P0 FINISHED
Object public transportation infrastructure project C2938 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2248e3444819081b05712dc6873de completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8 p.m.