Triple

T30378717
Position Surface form Disambiguated ID Type / Status
Subject Los Angeles Metro Green Line project E772762 entity
Predicate instanceOf P0 FINISHED
Object light rail transit line project C5215 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: light rail transit line project
Context triple: [Los Angeles Metro Green Line project, instanceOf, light rail transit line project]
  • A. light rail transit line chosen
    A light rail transit line is a fixed-route urban or suburban rail corridor using electrically powered, relatively low-capacity trains that operate on dedicated or semi-exclusive tracks to provide frequent, short- to medium-distance passenger service.
  • B. light rail expansion project
    A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
  • C. commuter rail project
    A commuter rail project is a coordinated planning, design, and construction effort to develop or improve rail services that transport passengers between suburbs or outlying regions and a central urban area, typically focused on reducing congestion and improving regional mobility.
  • D. light rail vehicle
    A light rail vehicle is a rail-based transit vehicle designed for urban and suburban passenger service, typically operating on dedicated or shared tracks with frequent stops and moderate capacity.
  • E. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2248e3444819081b05712dc6873de completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8 p.m.