Triple

T30377296
Position Surface form Disambiguated ID Type / Status
Subject Simpson & Wilson E772727 entity
Predicate instanceOf P0 FINISHED
Object engineering and architectural firm C13191 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering and architectural firm
Context triple: [Simpson & Wilson, instanceOf, engineering and architectural firm]
  • A. architecture and design firm chosen
    A professional company that plans, designs, and often oversees the construction of buildings and interior spaces, integrating aesthetics, functionality, and client needs.
  • B. engineering firm
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • C. construction management firm
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • D. construction technology company
    A construction technology company develops and provides digital tools, software, and innovative systems that improve the planning, design, management, and execution of construction projects.
  • E. Beaux-Arts architectural firm
    A Beaux-Arts architectural firm is a design practice that creates grand, formally composed buildings characterized by classical symmetry, rich ornamentation, and academic planning principles rooted in the École des Beaux-Arts tradition.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2248e3444819081b05712dc6873de completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 8 p.m.