Triple

T30366562
Position Surface form Disambiguated ID Type / Status
Subject Doyang Hydro Project E772435 entity
Predicate instanceOf P0 FINISHED
Object irrigation facility C8943 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: irrigation facility
Context triple: [Doyang Hydro Project, instanceOf, irrigation facility]
  • A. irrigation dam chosen
    An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
  • B. irrigated district
    An irrigated district is a geographically defined area where water is systematically supplied and managed, typically through infrastructure like canals and pipelines, to support agricultural production and related land uses.
  • C. irrigation command area
    An irrigation command area is the total land surface that can be supplied with water from a specific irrigation system or source under its designed operating conditions.
  • D. irrigation organization
    An irrigation organization is an entity that plans, manages, and coordinates the distribution and maintenance of water resources and infrastructure for agricultural or landscape irrigation within a defined area.
  • E. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2248d71408190aec0d5c2001b1cff completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:58 p.m.