Triple
T30339081
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | NIM master |
E771698
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | AIX Network Installation Manager server |
C23410
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: AIX Network Installation Manager server Context triple: [NIM master, instanceOf, AIX Network Installation Manager server]
-
A.
AIX subsystem
An AIX subsystem is a modular component within the IBM AIX operating system that provides a specific set of services or functionalities, such as networking, printing, or system management, to support and extend core OS capabilities.
-
B.
system installation tool
A system installation tool is a software utility that automates the setup, configuration, and deployment of an operating system or application environment onto target hardware or virtual machines.
-
C.
network-based operating system deployment service
chosen
A network-based operating system deployment service centrally manages, configures, and automatically installs OS images over a network to multiple client machines.
-
D.
storage area network operating system
A storage area network operating system is specialized software that manages, coordinates, and optimizes data storage resources and connectivity across a dedicated high-speed network of storage devices and servers.
-
E.
network management system component
A network management system component is a modular software or hardware element that monitors, controls, and optimizes specific aspects of a network’s performance, configuration, security, or fault handling within an overall management framework.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2248aba24819095bb86480d55b23b |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 7:55 p.m.