Triple
T30320457
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | SEAT Martorell production plant |
E771183
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | SEAT facility |
C56908
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: SEAT facility Context triple: [SEAT Martorell production plant, instanceOf, SEAT facility]
-
A.
Thales Group facility
A Thales Group facility is a physical site owned or operated by Thales where research, development, production, testing, or support activities related to its aerospace, defense, security, or transportation solutions are conducted.
-
B.
Empa site
An Empa site is a designated physical or virtual location where Empa conducts its research, innovation, and technology transfer activities in materials science and related fields.
-
C.
ESA facility
An ESA facility is a specialized location, infrastructure, or installation operated or supported by the European Space Agency to conduct space-related research, development, testing, mission operations, or support services.
-
D.
JAXA facility
A JAXA facility is a physical site operated by the Japan Aerospace Exploration Agency that supports space-related research, development, testing, mission control, or public outreach activities.
-
E.
SAP facility
An SAP facility is a physical or virtual location within an organization where SAP systems, infrastructure, and related operations are hosted, managed, and supported to enable business processes.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f22489ee8481909344649bfbb92e83 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 7:52 p.m.