Triple

T30300196
Position Surface form Disambiguated ID Type / Status
Subject Intel-based Mac E770632 entity
Predicate finalPhaseOutBeganYear P193060 FINISHED
Object 2020 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2020 | Statement: [Intel-based Mac, finalPhaseOutBeganYear, 2020]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finalPhaseOutBeganYear
Context triple: [Intel-based Mac, finalPhaseOutBeganYear, 2020]
  • A. plannedShutdownYear
    Indicates the year in which an entity is scheduled or planned to be shut down or taken out of operation.
  • B. trialEndYear
    Indicates the calendar year in which a trial or experimental study concludes.
  • C. firstPhaseEndDate
    Indicates the date on which the first phase of a process, project, or activity is completed or scheduled to end.
  • D. withdrawalEndYear
    Indicates the year in which a withdrawal process or period comes to an end.
  • E. exitYear
    Indicates the year in which an entity leaves, finishes, or ceases its association with another entity or context.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224881b948190b8c4921b250a44a3 completed April 29, 2026, 3:32 p.m.
NER Named-entity recognition batch_69fd37b695c88190855801626f91c4cd completed May 8, 2026, 1:09 a.m.
PD Predicate disambiguation batch_69fd374cccf08190a230e87164af5938 completed May 8, 2026, 1:07 a.m.
PDg Predicate description generation batch_69fd37b45b4481908b947b52fbcb7ade completed May 8, 2026, 1:09 a.m.
Created at: April 29, 2026, 7:48 p.m.