Triple
T3027653
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Provisional national authority |
E82816
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | temporary government |
C11946
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: temporary government Context triple: [Provisional national authority, instanceOf, temporary government]
-
A.
temporary city
A temporary city is a short-lived, purpose-built urban environment that provides essential infrastructure, services, and social spaces for a limited time before being dismantled or abandoned.
-
B.
temporary structure
A temporary structure is a short-term physical construction erected for a limited duration to serve a specific, often transitional, purpose before being removed or replaced.
-
C.
de facto government
chosen
A de facto government is an authority that exercises actual control over a territory and population without being legally or formally recognized as the legitimate governing power.
-
D.
short-lived state
A short-lived state is a temporary condition or configuration of an object or system that exists only briefly during a specific phase of processing before transitioning to another state or being discarded.
-
E.
provisional legislative body
A provisional legislative body is a temporary lawmaking assembly established to exercise legislative authority during a transitional or interim period before a permanent government structure is formed or restored.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b21a62881908ec5dd4fba4a187c |
completed | March 8, 2026, 2:43 p.m. |
Created at: March 8, 2026, 3 p.m.