Triple

T30272192
Position Surface form Disambiguated ID Type / Status
Subject Hans Pomeranz E769834 entity
Predicate instanceOf P0 FINISHED
Object post-production specialist C3090 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: post-production specialist
Context triple: [Hans Pomeranz, instanceOf, post-production specialist]
  • A. post-production process
    The post-production process is the stage in media creation where recorded material is edited, enhanced, and finalized through tasks such as cutting, sound design, visual effects, color correction, and mastering before distribution.
  • B. post-production company
    A post-production company is a specialized business that handles the editing, visual effects, sound design, color grading, and final assembly of film, television, and other media projects after principal photography is completed.
  • C. production professional
    A production professional is an individual responsible for planning, coordinating, and overseeing the technical and logistical aspects of creating media, events, or manufactured goods to ensure efficient, high-quality output.
  • D. film editor chosen
    A film editor is a professional who selects, arranges, and refines recorded footage, sound, and visual elements to craft a coherent and engaging final motion picture.
  • E. film post-production company
    A film post-production company is a business that specializes in editing, visual effects, sound design, color grading, and final mastering to complete and polish film and video projects after principal photography.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224856d9881908c7f0dd64f059672 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:44 p.m.