Triple

T30231604
Position Surface form Disambiguated ID Type / Status
Subject Brown stages of language development E768643 entity
Predicate instanceOf P0 FINISHED
Object morphosyntactic development scale C57165 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: morphosyntactic development scale
Context triple: [Brown stages of language development, instanceOf, morphosyntactic development scale]
  • A. language proficiency scale
    A language proficiency scale is a structured framework that categorizes and describes a learner’s ability to understand, speak, read, and write a language across progressive levels of competence.
  • B. morphological system
    A morphological system is the structured set of rules and patterns by which a language forms and modifies words to express grammatical relationships and meanings.
  • C. morphology test
    A morphology test is an assessment designed to evaluate the structure, form, and patterns of words or biological organisms, focusing on how their components are organized and related.
  • D. مؤلَّف لغوي
    مؤلَّف لغوي هو عمل مكتوب أو منطوق منظم في لغة معينة يهدف إلى نقل معنى أو معرفة أو إبداع لغوي ضمن بنية نصية محددة.
  • E. linguistic alignment pattern
    A linguistic alignment pattern is the systematic way a language organizes and marks the grammatical roles of participants in events, such as subjects, objects, and agents, across its clause structures.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2248108208190be60bf1af343ce70 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:36 p.m.