Triple

T30154853
Position Surface form Disambiguated ID Type / Status
Subject Yuzui (Fish Mouth) levee E766494 entity
Predicate instanceOf P0 FINISHED
Object river diversion structure C19268 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: river diversion structure
Context triple: [Yuzui (Fish Mouth) levee, instanceOf, river diversion structure]
  • A. diversion dam chosen
    A diversion dam is a low barrier built across a river or stream to redirect water into canals, pipelines, or other conveyance systems for irrigation, municipal use, or hydropower, rather than for large-scale storage.
  • B. river weir
    A river weir is a low dam built across a river to raise the water level, regulate flow, and sometimes measure discharge or divert water.
  • C. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • D. lock and dam structure
    A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
  • E. river structure
    A river structure is any engineered or natural formation built in, on, or alongside a river to influence its flow, stability, navigation, or ecological function.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22479cd088190ab4c6f3fce39d1c5 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:20 p.m.