Triple

T30150940
Position Surface form Disambiguated ID Type / Status
Subject 黄浦江 E766392 entity
Predicate instanceOf P0 FINISHED
Object 城市河流 C17618 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 城市河流
Context triple: [黄浦江, instanceOf, 城市河流]
  • A. 长江沿岸城市
    长江沿岸城市是指分布在长江干流两岸、以长江水系为依托,在航运、经济、文化和生态等方面与长江紧密相连并深受其影响的城市集合。
  • B. urban watercourse chosen
    An urban watercourse is a natural or engineered channel of flowing water that runs through a city or town, shaped and managed by surrounding urban infrastructure and land use.
  • C. 景观堤岸
    景观堤岸是一种兼具防洪护岸功能与景观休闲、生态修复等多重价值的滨水堤岸设施。
  • D. 市街地
    市街地とは、建物や道路、商業施設などが集中的に整備され、人や車の往来が多い都市的な土地利用が行われている区域である。
  • E. 日本の都市
    日本の都市は、高度に発展したインフラと公共交通機関、歴史と現代文化が融合した多様な都市空間を特徴とする、日本国内の行政的・地理的な都市地域である。
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22479cd088190ab4c6f3fce39d1c5 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:20 p.m.