Triple

T30145716
Position Surface form Disambiguated ID Type / Status
Subject Hannover-Stöcken plant E766247 entity
Predicate instanceOf P0 FINISHED
Object Volkswagen production facility C4810 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Volkswagen production facility
Context triple: [Hannover-Stöcken plant, instanceOf, Volkswagen production facility]
  • A. Mercedes-Benz factory
    A Mercedes-Benz factory is an industrial facility where Mercedes-Benz vehicles and components are designed, manufactured, assembled, and quality-tested using advanced engineering and automated production systems.
  • B. automobile factory
    An automobile factory is a large-scale industrial facility where raw materials and components are systematically assembled, tested, and finished into complete motor vehicles using coordinated machinery, labor, and production processes.
  • C. General Motors factory
    A General Motors factory is a large-scale automotive manufacturing facility where GM designs, assembles, and tests vehicles and related components using industrial machinery, robotics, and human labor.
  • D. automotive factory chosen
    An automotive factory is a large-scale industrial facility where vehicles and their components are systematically designed, manufactured, assembled, and tested using specialized machinery, robotics, and human labor.
  • E. Volkswagen vehicle
    A Volkswagen vehicle is a motorized road transport unit produced by the Volkswagen brand, characterized by German engineering, standardized design features, and compliance with automotive safety and emissions regulations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2247909048190ae86c2160cf8b566 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:18 p.m.