Triple

T30145508
Position Surface form Disambiguated ID Type / Status
Subject MAN Lion’s City DD E766242 entity
Predicate instanceOf P0 FINISHED
Object urban bus C25335 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban bus
Context triple: [MAN Lion’s City DD, instanceOf, urban bus]
  • A. low-floor city bus chosen
    A low-floor city bus is a public transit vehicle designed with a floor close to street level to enable easy, step-free boarding and alighting for all passengers, including those with mobility impairments.
  • B. local bus route
    A local bus route is a designated path within a limited geographic area along which buses operate on a regular schedule to transport passengers between specific stops.
  • C. regional bus service
    A regional bus service is a public transportation system that operates scheduled bus routes connecting multiple towns or cities within a specific geographic area.
  • D. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • E. feeder bus service
    A feeder bus service is a local transit route that connects neighborhoods or outlying areas to major transportation hubs or mainline routes, facilitating convenient transfers and extended network access.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2247909048190ae86c2160cf8b566 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:18 p.m.