Triple

T30140785
Position Surface form Disambiguated ID Type / Status
Subject King County Water Taxi (West Seattle–Downtown Seattle) E766121 entity
Predicate instanceOf P0 FINISHED
Object passenger-only ferry service C24478 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: passenger-only ferry service
Context triple: [King County Water Taxi (West Seattle–Downtown Seattle), instanceOf, passenger-only ferry service]
  • A. passenger-only ferry route chosen
    A passenger-only ferry route is a scheduled waterway service that transports people, but not vehicles or freight, between designated terminals or ports.
  • B. passenger ferry
    A passenger ferry is a vessel designed to transport people, and sometimes light vehicles or cargo, across bodies of water on regular, short-distance routes.
  • C. ferry service
    A ferry service is a transportation operation that regularly carries passengers, vehicles, and sometimes cargo across bodies of water along fixed routes and schedules.
  • D. ferry service network
    A ferry service network is a coordinated system of water-based transport routes, vessels, terminals, and schedules that moves passengers and cargo between multiple ports or coastal locations.
  • E. ferry crossing
    A ferry crossing is a designated route or location where a ferry transports passengers, vehicles, or goods across a body of water between two points.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2247909048190ae86c2160cf8b566 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:17 p.m.