Triple

T30114847
Position Surface form Disambiguated ID Type / Status
Subject Office of the Administrator E765386 entity
Predicate instanceOf P0 FINISHED
Object component of the Panama Canal Commission C25659 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: component of the Panama Canal Commission
Context triple: [Office of the Administrator, instanceOf, component of the Panama Canal Commission]
  • A. Panama Canal engineer
    A Panama Canal engineer is a professional responsible for designing, maintaining, and optimizing the canal’s complex system of locks, channels, and supporting infrastructure to ensure safe and efficient maritime transit between the Atlantic and Pacific Oceans.
  • B. Panama Canal infrastructure
    Panama Canal infrastructure encompasses the system of locks, channels, dams, ports, support facilities, and control technologies that enable the transit, management, and maintenance of maritime traffic through the Panama Canal.
  • C. river commission
    A river commission is an authoritative body responsible for managing, regulating, and coordinating the use, conservation, and development of a river and its surrounding resources, often across multiple jurisdictions.
  • D. government agency of Panama chosen
    A government agency of Panama is an official public institution established by the Panamanian state to implement laws, deliver public services, and administer specific policy areas within the country.
  • E. corps of engineers
    A corps of engineers is an organized body of military or civilian engineers responsible for planning, designing, constructing, and maintaining infrastructure and technical projects, often in support of national defense or public works.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22475ad7c8190be7f9541044a0bbb completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:11 p.m.