Triple
T30102413
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Terminal 2 (Trivandrum International Airport) |
E765033
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | international passenger terminal |
C5568
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: international passenger terminal Context triple: [Terminal 2 (Trivandrum International Airport), instanceOf, international passenger terminal]
-
A.
international terminal area
chosen
An international terminal area is a designated section of an airport where passengers check in, depart, arrive, and transit for international flights, including associated facilities such as customs, immigration, security, and boarding gates.
-
B.
international airport
An international airport is a large, complex transportation hub that facilitates the arrival, departure, and transfer of passengers and cargo between countries through scheduled and chartered flights, customs, immigration, and related services.
-
C.
passenger terminal area
A passenger terminal area is a designated zone within a transportation facility where travelers access services such as check-in, security, boarding, and baggage claim.
-
D.
passenger terminal concourse
A passenger terminal concourse is a large, central circulation space within a transport terminal where travelers move between entrances, ticketing, security, and boarding areas, often containing seating, retail, and information services.
-
E.
international port
An international port is a major maritime facility equipped to handle the arrival, departure, and transfer of cargo and passengers between countries, integrating customs, logistics, and transportation infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f22474e4288190b5f895fe3974aa92 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 7:08 p.m.