Triple

T30095147
Position Surface form Disambiguated ID Type / Status
Subject Puerto Madero port project E764844 entity
Predicate instanceOf P0 FINISHED
Object port construction project C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: port construction project
Context triple: [Puerto Madero port project, instanceOf, port construction project]
  • A. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. maritime structure
    A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
  • C. harbor deepening project
    A harbor deepening project is a large-scale marine engineering initiative that increases the depth of a harbor’s navigation channels and berths to safely accommodate larger vessels and improve port capacity.
  • D. bridge construction company
    A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
  • E. proposed dam project
    A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22474e4288190b5f895fe3974aa92 completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:07 p.m.