Triple
T30094067
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Plan Colombia |
E764814
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bilateral initiative |
C3024
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bilateral initiative Context triple: [Plan Colombia, instanceOf, bilateral initiative]
-
A.
bilateral commission
A bilateral commission is a formal joint body established by two parties, typically states or organizations, to negotiate, coordinate, and oversee matters of mutual interest.
-
B.
bilateral meeting
A bilateral meeting is a formal or informal discussion between representatives of two distinct parties, typically organizations or countries, to negotiate, coordinate, or resolve specific issues of mutual interest.
-
C.
diplomatic initiative
chosen
A diplomatic initiative is a coordinated effort by one or more states or international actors to open, advance, or resolve political, economic, or security issues through negotiation and dialogue rather than coercion or conflict.
-
D.
bilateral diplomatic agreement
A bilateral diplomatic agreement is a formal, negotiated arrangement between two sovereign states that defines mutual rights, obligations, and cooperative actions in specific areas of shared interest.
-
E.
bilateral relations
Bilateral relations are the political, economic, and diplomatic interactions and agreements that occur directly between two sovereign states.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f22474e4288190b5f895fe3974aa92 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 7:06 p.m.