Triple

T30093837
Position Surface form Disambiguated ID Type / Status
Subject Armco-Ferro House E764809 entity
Predicate instanceOf P0 FINISHED
Object prefabricated house C42273 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: prefabricated house
Context triple: [Armco-Ferro House, instanceOf, prefabricated house]
  • A. prefabricated structure chosen
    A prefabricated structure is a building or structural system whose components are manufactured off-site in standardized sections and then transported and assembled at the final location.
  • B. portable dwelling
    A portable dwelling is a movable, self-contained shelter designed to provide temporary or semi-permanent living space that can be transported and set up in different locations.
  • C. wooden house
    A wooden house is a residential structure primarily constructed from timber, offering natural insulation, aesthetic warmth, and structural support through its wooden framework and finishes.
  • D. prefabricated bridge
    A prefabricated bridge is a modular bridge structure whose components are manufactured off-site in controlled conditions and then transported and assembled rapidly at the installation location.
  • E. single-family house
    A single-family house is a standalone residential building designed to be occupied by one household, typically featuring private living spaces, a kitchen, bathrooms, and often a yard or garden.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22473c0fc8190a926a8051b3b378b completed April 29, 2026, 3:32 p.m.
Created at: April 29, 2026, 7:06 p.m.