Triple
T30075555
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jaude tram stop |
E764309
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Clermont-Ferrand tramway station |
C56688
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Clermont-Ferrand tramway station Context triple: [Jaude tram stop, instanceOf, Clermont-Ferrand tramway station]
-
A.
Lyon Metro station
A Lyon Metro station is a designated public transit facility within the Lyon Metro network where passengers access, board, and transfer between metro trains.
-
B.
Marseille Metro station
A Marseille Metro station is a designated public transit facility within the Marseille Metro network where trains stop to allow passengers to board, alight, and transfer between lines or other transport modes.
-
C.
Transilien station
A Transilien station is a railway facility in the Île-de-France region that serves suburban and regional commuter trains operated under the Transilien network, providing passenger access, ticketing, and related services.
-
D.
TER Normandie station
A TER Normandie station is a regional railway stop in the Normandy region of France that serves as a boarding, alighting, and transfer point for passengers using the TER Normandie train network.
-
E.
Turin Metro station
A Turin Metro station is a designated stop along the Turin Metro rapid transit system where passengers can board, alight, and transfer between metro trains and other modes of urban transportation.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f22472eee081909791dc372aa766e9 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 7:01 p.m.