Triple

T30071138
Position Surface form Disambiguated ID Type / Status
Subject new-build P2 No. 2007 Prince of Wales E764184 entity
Predicate hasOperatorPlanned P141921 FINISHED
Object mainline certified charter operators in the UK LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: mainline certified charter operators in the UK | Statement: [new-build P2 No. 2007 Prince of Wales, hasOperatorPlanned, mainline certified charter operators in the UK]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasOperatorPlanned
Context triple: [new-build P2 No. 2007 Prince of Wales, hasOperatorPlanned, mainline certified charter operators in the UK]
  • A. hasPlannedOperator chosen
    Indicates that an entity has a designated operator who is planned or scheduled to perform an operation or service for it.
  • B. hasPlannedOperatorType
    Indicates that an entity is associated with a specific type of operator that is intended or scheduled to perform an operation or service.
  • C. operatorPlanned
    Indicates that an operator has scheduled or arranged a specific action, process, or operation to occur.
  • D. hasPlannedPart
    Indicates that one entity includes another entity as a component or segment within a planned or scheduled whole.
  • E. hasCampOperator
    Indicates that a camp is operated or managed by a specific operator or organization.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2247221388190a13a22c47094a0ef completed April 29, 2026, 3:32 p.m.
NER Named-entity recognition batch_69f73ae120bc8190bff94d38d7a7a00d completed May 3, 2026, 12:09 p.m.
PD Predicate disambiguation batch_69f73a38d0848190aa5139144b8561c6 completed May 3, 2026, 12:06 p.m.
Created at: April 29, 2026, 7 p.m.