Triple
T30068404
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Roman theater |
E764105
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | theater building type |
C3104
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: theater building type Context triple: [Roman theater, instanceOf, theater building type]
-
A.
group of theatres
A group of theatres is an organized collection of multiple theatre venues, typically managed under a single ownership or brand for coordinated programming, operations, and marketing.
-
B.
theater
chosen
A theater is a venue designed for live performances or film screenings, featuring a stage or screen, seating for an audience, and supporting technical and backstage facilities.
-
C.
theatre builder
A theatre builder is a professional or entity responsible for designing, constructing, and outfitting performance spaces to meet artistic, technical, and audience needs.
-
D.
Art Deco theater
An Art Deco theater is a performance venue characterized by streamlined geometric forms, bold ornamentation, and luxurious materials that reflect the modernist design aesthetics of the early 20th century.
-
E.
stone theatre complex
A stone theatre complex is a large, architecturally integrated performance venue built primarily of stone, typically comprising a main auditorium, stage, backstage facilities, and associated public spaces such as lobbies, courtyards, and ancillary structures.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2247221388190a13a22c47094a0ef |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 7 p.m.