Triple
T3005179
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Karachi District |
E81882
|
entity |
| Predicate | hasTransportInfrastructure |
P2560
|
FINISHED |
| Object | M-9 Motorway |
E346120
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M-9 Motorway | Statement: [Karachi District, hasTransportInfrastructure, M-9 Motorway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: M-9 Motorway Context triple: [Karachi District, hasTransportInfrastructure, M-9 Motorway]
-
A.
M-9 Motorway
chosen
The M-9 Motorway is a major Pakistani expressway that links the cities of Karachi and Hyderabad in the province of Sindh.
-
B.
M80 motorway
The M80 motorway is a major road in Scotland connecting Glasgow to Stirling and forming part of the primary route between central Scotland and the north.
-
C.
M26 motorway
The M26 motorway is a short English motorway in Kent that links the M25 and M20, serving as a key connector for traffic between London and the Channel ports.
-
D.
M-2 Motorway
The M-2 Motorway is a major Pakistani expressway that links the cities of Islamabad and Lahore, serving as a key part of the country’s north–south transportation corridor.
-
E.
M56 motorway
The M56 motorway is a major road in North West England that connects Manchester to North Wales and serves as a key route to Manchester Airport.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ad8b1c4de88190a83b7cefaa1f2842 |
completed | March 8, 2026, 2:43 p.m. |
| NER | Named-entity recognition | batch_69ad9a15ad9c81908255003bdb38d603 |
completed | March 8, 2026, 3:47 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69be4d59f188819093e3a6c7037593cf |
completed | March 21, 2026, 7:48 a.m. |
Created at: March 8, 2026, 2:59 p.m.