Triple
T30039425
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Amsterdam Airport Schiphol ground transport network |
E763255
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ground transport network |
C4130
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ground transport network Context triple: [Amsterdam Airport Schiphol ground transport network, instanceOf, ground transport network]
-
A.
ground transportation link
A ground transportation link is a physical connection, such as a road, rail line, or dedicated corridor, that enables the movement of people or goods between two or more locations on land.
-
B.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
C.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
D.
rapid transit network
A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
-
E.
transport infrastructure network
chosen
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2246fb2b88190acff36bf7975c8f0 |
completed | April 29, 2026, 3:32 p.m. |
Created at: April 29, 2026, 6:52 p.m.