Triple

T3000917
Position Surface form Disambiguated ID Type / Status
Subject Mount Kenya E81182 entity
Predicate hasPopularClimbingRoute P2405 FINISHED
Object Naro Moru route
Naro Moru route is one of the main and most commonly used trekking paths leading to the peaks of Mount Kenya, known for its relatively direct ascent and varied terrain.
E318868 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Naro Moru route | Statement: [Mount Kenya, hasPopularClimbingRoute, Naro Moru route]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Naro Moru route
Context triple: [Mount Kenya, hasPopularClimbingRoute, Naro Moru route]
  • A. Fujinomiya Trail
    The Fujinomiya Trail is one of the primary climbing routes up Mount Fuji, known for its relatively short ascent and popular access from Shizuoka Prefecture.
  • B. Yoshida Trail
    The Yoshida Trail is the most popular and well-developed hiking route used by climbers ascending Japan’s Mount Fuji, especially from the Yamanashi Prefecture side.
  • C. Gotemba Trail
    Gotemba Trail is one of the main climbing routes on Japan’s Mount Fuji, known for its long, less crowded ascent across expansive volcanic ash slopes.
  • D. Subashiri Trail
    The Subashiri Trail is one of the principal climbing routes on Mount Fuji, known for its forested lower sections, volcanic sand runnels, and comparatively less crowded ascent.
  • E. Akagi Panorama Road
    Akagi Panorama Road is a scenic mountain roadway in Japan known for its winding route and expansive views around Mount Akagi.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Naro Moru route
Triple: [Mount Kenya, hasPopularClimbingRoute, Naro Moru route]
Generated description
Naro Moru route is one of the main and most commonly used trekking paths leading to the peaks of Mount Kenya, known for its relatively direct ascent and varied terrain.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Naro Moru route
Target entity description: Naro Moru route is one of the main and most commonly used trekking paths leading to the peaks of Mount Kenya, known for its relatively direct ascent and varied terrain.
  • A. Fujinomiya Trail
    The Fujinomiya Trail is one of the primary climbing routes up Mount Fuji, known for its relatively short ascent and popular access from Shizuoka Prefecture.
  • B. Yoshida Trail
    The Yoshida Trail is the most popular and well-developed hiking route used by climbers ascending Japan’s Mount Fuji, especially from the Yamanashi Prefecture side.
  • C. Gotemba Trail
    Gotemba Trail is one of the main climbing routes on Japan’s Mount Fuji, known for its long, less crowded ascent across expansive volcanic ash slopes.
  • D. Subashiri Trail
    The Subashiri Trail is one of the principal climbing routes on Mount Fuji, known for its forested lower sections, volcanic sand runnels, and comparatively less crowded ascent.
  • E. Akagi Panorama Road
    Akagi Panorama Road is a scenic mountain roadway in Japan known for its winding route and expansive views around Mount Akagi.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasPopularClimbingRoute
Context triple: [Mount Kenya, hasPopularClimbingRoute, Naro Moru route]
  • A. isClimbingRouteFeatureOn
    Indicates that a specific climbing route feature is located on or part of a particular climbing route.
  • B. climbingRoute chosen
    Indicates a relationship where a path or sequence of holds is designated for ascending a surface, typically in rock climbing or similar activities.
  • C. climbingActivity
    Indicates an activity where an entity ascends or scales a surface, structure, or natural formation, typically using physical effort and coordination.
  • D. climbingArea
    Indicates that one entity is a designated location or site used for climbing activities in relation to another entity.
  • E. mountainRangeClimbedIn
    Indicates that a particular mountain range is the location in which a climbing activity or ascent took place.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ad8b187fc8819085914d3c9ea3142d completed March 8, 2026, 2:43 p.m.
NER Named-entity recognition batch_69ad9a1022e48190afee77db94635ff2 completed March 8, 2026, 3:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69b12e4b54188190bf900bf10061a57a completed March 11, 2026, 8:56 a.m.
NEDg Description generation batch_69b12f188c7c81908d1d575252dc4bda completed March 11, 2026, 9 a.m.
NED2 Entity disambiguation (via description) batch_69b1c9bccb3081909e6869b5cba68117 completed March 11, 2026, 7:59 p.m.
PD Predicate disambiguation batch_69ad9615fefc8190ad96da92519cb7a3 completed March 8, 2026, 3:30 p.m.
Created at: March 8, 2026, 2:59 p.m.