Triple

T29991170
Position Surface form Disambiguated ID Type / Status
Subject WCW Power Plant E761882 entity
Predicate instanceOf P0 FINISHED
Object professional wrestling training facility C48893 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: professional wrestling training facility
Context triple: [WCW Power Plant, instanceOf, professional wrestling training facility]
  • A. professional wrestling school chosen
    A professional wrestling school is a specialized training facility where aspiring wrestlers learn in-ring techniques, performance skills, safety practices, and industry knowledge to prepare for careers in sports entertainment.
  • B. professional wrestling promotion
    A professional wrestling promotion is an organization that produces, markets, and presents scripted wrestling events and storylines using contracted performers for live audiences and broadcast media.
  • C. martial arts training facility
    A martial arts training facility is a dedicated space equipped and staffed to teach, practice, and refine various combat disciplines, techniques, and physical conditioning.
  • D. stunt training facility
    A stunt training facility is a specialized environment equipped with professional instructors, safety gear, and controlled setups where performers learn, rehearse, and refine physical stunts and action sequences for film, television, and live events.
  • E. energy training facility
    An energy training facility is a specialized center where individuals and organizations learn, practice, and develop skills related to energy production, management, efficiency, and safety using dedicated equipment and simulated environments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224695498819094a81037cad401e2 completed April 29, 2026, 3:31 p.m.
Created at: April 29, 2026, 6:38 p.m.