Triple
T29983720
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Odyssey launch platform |
E761667
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mobile offshore launch platform |
C16149
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mobile offshore launch platform Context triple: [Odyssey launch platform, instanceOf, mobile offshore launch platform]
-
A.
floating production storage and offloading vessel
A floating production storage and offloading vessel is an offshore ship-shaped facility that processes hydrocarbons from subsea wells, stores the produced oil, and offloads it to shuttle tankers for transport.
-
B.
floating liquefied natural gas facility
A floating liquefied natural gas facility is an offshore, ship-like installation that extracts, processes, liquefies, stores, and offloads natural gas directly at sea.
-
C.
mobile work platform
A mobile work platform is a movable, elevated structure designed to safely support workers and tools while performing tasks at varying heights.
-
D.
floating building
A floating building is a structure designed to remain buoyant and stable on water or in the air, providing habitable or functional space independent of traditional land-based foundations.
-
E.
maritime structure
chosen
A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2246851148190b8e76206db94b105 |
completed | April 29, 2026, 3:31 p.m. |
Created at: April 29, 2026, 6:35 p.m.