Triple

T29982857
Position Surface form Disambiguated ID Type / Status
Subject Kuala Tahan route E761642 entity
Predicate instanceOf P0 FINISHED
Object mountain access route C2414 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mountain access route
Context triple: [Kuala Tahan route, instanceOf, mountain access route]
  • A. mountaineering approach route
    A mountaineering approach route is the path or series of paths used to travel from the nearest access point, such as a trailhead or base camp, to the base of a climb or main objective in the mountains.
  • B. mountaineering route collection
    A mountaineering route collection is an organized set of documented climbing routes, typically grouped by region, mountain, or difficulty, used for planning, reference, and comparison by climbers and expedition planners.
  • C. mountain trail chosen
    A mountain trail is a marked or worn path through mountainous terrain designed for hiking, climbing, or traversing varying elevations and natural features.
  • D. mountain pass
    A mountain pass is a navigable route through a mountain range or over a ridge that provides a lower and more accessible crossing point between valleys or regions.
  • E. alpine climbing route section
    An alpine climbing route section is a distinct segment of a high-mountain ascent characterized by specific terrain, difficulty, and required techniques within the overall route.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2246851148190b8e76206db94b105 completed April 29, 2026, 3:31 p.m.
Created at: April 29, 2026, 6:35 p.m.