Triple
T29982857
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kuala Tahan route |
E761642
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mountain access route |
C2414
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mountain access route Context triple: [Kuala Tahan route, instanceOf, mountain access route]
-
A.
mountaineering approach route
A mountaineering approach route is the path or series of paths used to travel from the nearest access point, such as a trailhead or base camp, to the base of a climb or main objective in the mountains.
-
B.
mountaineering route collection
A mountaineering route collection is an organized set of documented climbing routes, typically grouped by region, mountain, or difficulty, used for planning, reference, and comparison by climbers and expedition planners.
-
C.
mountain trail
chosen
A mountain trail is a marked or worn path through mountainous terrain designed for hiking, climbing, or traversing varying elevations and natural features.
-
D.
mountain pass
A mountain pass is a navigable route through a mountain range or over a ridge that provides a lower and more accessible crossing point between valleys or regions.
-
E.
alpine climbing route section
An alpine climbing route section is a distinct segment of a high-mountain ascent characterized by specific terrain, difficulty, and required techniques within the overall route.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f2246851148190b8e76206db94b105 |
completed | April 29, 2026, 3:31 p.m. |
Created at: April 29, 2026, 6:35 p.m.